Crow Runner Link Manual do Utilizador Página 29

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 31
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 28
RUNNER LINK Gateway Installing the Receiver Server Configuration Program
16. Vide
o – for Video verification feature – currently not in used
17. Log Events – check the box to enable saving logs events operation,
create the folder name
18. Click the
button.
19. Connection with Central Station – select the communication media
connection
- If selected RS232, insert the correct COM port and the baud Rate
- If selected Network, insert the receiver server's IP address
- if selected Database , this is a JABLOTRON DB (MS-SQL) type , insert
all details of the DB server
19. Click the
button.
Remote
Work Station
26
Vista de página 28
1 2 ... 24 25 26 27 28 29 30 31

Comentários a estes Manuais

Sem comentários